Shipping calculated at checkout

Shipping calculated at checkout
30-day Returns
Secure Checkout

Morvella

Siemens mc0816s1200sct Meter-Load Center COMBINATION, 8 Space, 16 Circ

SKU: SKU-7C411C0A3A37

List Price: CA$641.14

CA$60.00 SAVE CA$581.14 (91%)

Price includes all taxes

In Stock — Ready to Dispatch

  • Shipping calculated at checkout · Delivery timing is shown in the shipping policy

  • 30-Day Returns · Eligibility rules apply

  • Secure Checkout · SSL encrypted payment

View shipping policy →

Eligible items may be returned within 30 days. See the return policy for conditions.

Payment Method

Cash on Delivery — pay when your order is delivered.

Product Details

About this product

Description

To meet the new requirements that pertain to the main electrical service panel used in the construction of new residences, as well as support increasing market demands for products that support solar energy installations, Siemens offers a. Once new requirement is that new homes be made "Solar Ready". As a whole, these code changes are intended to standardize energy efficient design and construction methods for both residential and commercial buildings. While the new standard does not mandate solar panel installation at the time of construction, it does define new solar provisioning requirements designed to make future solar electric installations easier and more affordable for home. Additionally, they respond to the AB32 legislation that requires all new residential construction in California be Zero Net Energy by 2020. These reserved spaces are required to be on the opposite (load) end from the main circuit breaker on the busbar and permanently marked as "For Future Solar Electric". Under the new code, the main electrical panel must have a minimum busbar rating of 200 amps. Title 24 - On July 1, 2014, California implemented significant and far reaching building code revisions known collectively as Title 24. To meet the new requirements that pertain to the main electrical service panel used in the construction of new residences, as well as support increasing market demands for products that support solar energy installations, Siemens offers a full portfolio of.

Key Features

  • Title 24 - On July 1, 2014, California implemented significant and far reaching building code revisions known collectively as Title 24.
  • As a whole, these code changes are intended to standardize energy efficient design and construction methods for both residential and commercial buildings.
  • Additionally, all service entry panels are required to have 2 reserved spaces on the load-side to allow for installation of a double pole circuit breaker for future solar electric installation.
  • While the new standard does not mandate solar panel installation at the time of construction, it does define new solar provisioning requirements designed to make future solar electric installations easier and more affordable for home.
  • To meet the new requirements that pertain to the main electrical service panel used in the construction of new residences, as well as support increasing market demands for products that support solar energy installations, Siemens offers a.
  • Once new requirement is that new homes be made "Solar Ready".

Shipping & Returns

  • Shipping calculated at checkout
  • Eligible returns within 30 days
  • See the shipping policy for current delivery timing
Full Policy →
CA$60.00 CA$641.14
In Stock